Title: Staff recommends that the City Council approve two Public Works Agreements with the option of two administratively approved one-year renewals, with Sloan Electric for a total contract amount not to exceed $291,000, for motor rewinding and pump and motor repair; and with Brax Company for a total contract amount not to exceed $201,000, for as-needed pump and motor repair services; and authorize the City Manager, or designee, to execute the agreements.
Attachments: 1. Staff Report, 2. Sloan Electromechanical Motor Rewinding and Pump Repair PWA, 3. Brax Company Pump and Motor Repair PWA

DATE:  October 9, 2024

 

TO:                       Honorable Mayor and City Councilmembers

 

FROM: Water Utilities Department

TITLE:  PUBLIC WORKS AGREEMENTS FOR AS NEEDED MOTOR REWINDING AND PUMP AND MOTOR REPAIR SERVICES FOR THE WATER UTILITIES DEPARTMENT

 

RECOMMENDATION

title

Staff recommends that the City Council approve two Public Works Agreements with the option of two administratively approved one-year renewals, with Sloan Electric for a total contract amount not to exceed $291,000, for motor rewinding and pump and motor repair; and with Brax Company for a total contract amount not to exceed $201,000, for as-needed pump and motor repair services; and authorize the City Manager, or designee, to execute the agreements.

body

BACKGROUND AND ANALYSIS

 

The Water Utilities Department utilizes pumps and motors throughout its water and wastewater systems.  These systems include water distribution, water and wastewater treatment, and wastewater collections. The pumps and motors are critical to the ability of the Department to transfer and treat water.  Failure to facilitate the necessary repairs in a timely manner could result in equipment failure potentially resulting in a sewage spill or loss of potable water supply.

 

Many of the motors and pumps need to be sent out to a vendor for inspection, in order to receive a quote for repair or at times replacement.  Having two vendors to perform these services provides both economy of scale and efficiency of time in this process. In addition, it provides redundancy and assurance of timely repairs or replacements if one of the vendors is unable to meet the Department’s needs at the time. For this reason, staff is requesting a purchase orders with Sloan Electric and Brax Company to provide as-needed pump and motor repair services.

 

On March 20, 2024, the City released a Request for Proposals (RFP) for qualified contractors to perform as needed pump and motor repair services for a term of three years with the option for two, one-year extensions. The RFP was advertised on the City’s website and one proposal was received from a qualified contractor for as needed pump and motor repair services.  Due to the fact that redundancy is necessary to meet this critical need, two additional proposals were eventually acquired. Staff reviewed the proposals and selected Sloan Electric and Brax Company based on cost, qualifications, and their extensive experience completing similar tasks.

 

FISCAL IMPACT

 

Staff is recommending that Sloan Electric and Brax Company be awarded Public Works Agreements in an amount not to exceed $291,000 and $201,000, respectively. Each contract will be for a term of one year with the possibility of two one-year extensions.

 

The tables below outline how the contracts will be funded initially and the available balances.

 

Table 1. Sloan Electric

Account Number

Contract Amount

Available Budget

Desalting Plant 750755711.5320

$  35,000

$161,185

SLR Water Reclamation Facility 800805721.5320

    67,500

  400,750

Water Filtration Plant 750754711.5320

    35,000

  146,909

La Salina Wastewater 800804721.5320

    27,500

  150,836

Oceanside Pure Water 750775711.5320

    10,000

    89,736

Sewer Collection 800803721.5320

    50,000

  194,776

Hydro-Electric Generation 750752711.5320

      3,500

    17,000

Pump Station Upgrades 908754500712.5704.10600

    55,000

  286,000

Recycled Water Treatment 750704711.5320

      7,500

$  68,490

Total:

$291,000

 

 

Table 2. Brax Company

Account Number

Contract Amount

Available Budget

Sewer Collection 800803721.5320

$  50,000

$194,776

SLR Water Reclamation Facility 800805721.5320

    42,500

  400,750

La Salina Wastewater 800804721.5320

      7,500

  155,984

Oceanside Pure Water 750755711.5320

    15,000

  161,185

Recycled Water Treatment 750704711.5320

      7,500

    69,490

Water Filtration Plant 750754711.5320

    15,000

  146,909

Desalting Plant 750775711.5320

      5,000

    89,736

Hydro-Electric Generation 750752711.5320

      3,500

    17,000

Pump Station Upgrades 908754500712.5704.10600

    55,000

$286,000

Total:

$201,000

 

 

 

Future years cost will be funded during the normal budget process.

 

COMMISSION OR COMMITTEE REPORT

 

The Utilities Commission approved staff’s recommendation at its regularly scheduled meeting on September 17, 2024.

 

CITY ATTORNEY’S ANALYSIS

 

The referenced documents have been reviewed by the City Attorney and approved as to form.

 

end

 

Prepared by:  Martin Popma, Water Utilities Division Manager

Reviewed by:  Lindsay Leahy, Water Utilities Director

Submitted by: Jonathan Borrego, City Manager                                                                                                                              

 

ATTACHMENTS:

1.                     Staff Report

2.                     Public Works Agreement - Sloan

3.                     Public Works Agreement - Brax