Legislation Details

File #: 26-1723    Version: 1
Type: Purchase Order Status: Consent Agenda
File created: 10/6/2026 In control: City Council
On agenda: 12/2/2026 Final action:
Title: Staff recommends that the City Council approve a purchase order to Consolidated Electric Distributors (CED), in the amount of $108,731 for traffic signal poles for the Carey Road and Canyon Drive Traffic Signal Project; authorize the procurement as sole-source; and authorize the Financial Services Director, or designee, to execute the purchase order.
Attachments: 1. Staff Report, 2. CED Quote, 3. Sole-Source Justification
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

DATE:  December 2, 2026

 

TO:                       Honorable Mayor and City Councilmembers

 

FROM: Development Services Department

TITLE: 
PURCHASE ORDER FOR THE PROCUREMENT OF EQUIPMENT FOR THE TRAFFIC SIGNAL PROJECT CAREY RD/CANYON DRIVE TRAFFIC SIGNAL PROJECT

 

RECOMMENDATION

title

Staff recommends that the City Council approve a purchase order to Consolidated Electric Distributors (CED), in the amount of $108,731 for traffic signal poles for the Carey Road and Canyon Drive Traffic Signal Project; authorize the procurement as sole-source; and authorize the Financial Services Director, or designee, to execute the purchase order.

body

BACKGROUND AND ANALYSIS

 

The proposed Carey Road/Canyon Drive Traffic Signal Project (“Project”) will provide a new signalized intersection and associated roadway and pedestrian improvements. The work consists of the installation of traffic signal poles, lighting and related equipment; construction of American with Disabilities Act (ADA) compliant pedestrian curb ramps; and a grind and asphalt overlay of the existing intersection. The intersection is currently illuminated by a luminaire mounted on an SDG&E-owned power pole. Staff is coordinating with SDG&E to remove the existing luminaire and power pole in conjunction with start of construction for the Project.

 

Per the City’s Traffic Signal and Street Light Design Guidelines, new traffic signals and street lights installed along the Carey Road and Canyon Drive corridor shall have a galvanized gray appearance. These traffic signal poles require approximately 24 to 26 weeks to fabricate and deliver to the City. However, before a contractor is even able to order project materials and equipment, it typically takes eight weeks to process a construction contract, review and approve project submittals, and issue a Notice to Proceed. As such, staff is requesting City Council approval of a purchase order to procure the traffic signal poles and associated equipment in advance, rather than having the construction contractor procure these materials. This approach will allow the City to initiate procurement while the construction contract is being prepared and processed, taking advantage of the favorable delivery schedule offered by CED and resulting in an estimated eight-week savings to the overall project schedule.

 

Per the City’s procurement policy: “…Goods and services that can be obtained from only one vendor or one known source as the results of standardization, unique performance capabilities, manufacturing processes, compatibility requirement or market conditions are exempt from manufacturing processes, compatibility requirement or market conditions are exempt from competitive bidding but may negotiate competitive pricing. These sole source purchases may include propriety items sold directly from the manufacturer, items that have only one distributor authorized to sell in this area, or a certain product has been proven to be the only product acceptable.” The Ameron traffic signal poles proposed for this project meet the City's Traffic Signal and Street Light Design Guidelines, including the required galvanized gray appearance, and are consistent with equipment utilized throughout the City's traffic signal network. CED is the only authorized local distributor for the specified equipment. Accordingly, staff is requesting approval of a sole-source purchase to procure the required materials in accordance with City standards and facilitate timely delivery in advance of construction.

 

Staff anticipates submitting a separate request for City Council approval of the proposed Project’s construction contract this winter.

 

FISCAL IMPACT

 

The cost for the traffic poles is $108,731 and will be charged to the Traffic Signal Carey/Canyon account 903186123562.5703.10700. This account has an available balance of $1,498,295; therefore, sufficient funds are available.

 

Account Number

Amount

Available Balance

Traffic Signal Carey/Canyon 903186123562.5703.10700

$108,731

$1,498,295

 

COMMISSION OR COMMITTEE REPORT

 

Does not apply.

 

CITY ATTORNEY’S ANALYSIS

 

Purchases must comply with City Code Chapter 28A.

end

 

Prepared by: Luis Cardenas, Associate Engineer

Reviewed by: Lillian Doherty, Development Services Director                     

Submitted by: Jonathan Borrego, City Manager

 

ATTACHMENTS:

1.                     CED Quote

2.                     Sole-Source Justification