DATE: December 2, 2026
TO: Honorable Mayor and City Councilmembers
FROM: Water Utilities Department
TITLE: PROFESSIONAL SERVICES AGREEMENT WITH N2W ENGINEERING, INC. FOR THE PRELIMINARY DESIGN OF THE LEISURE VILLAGE #1 LIFT STATION UPGRADES AND FINAL DESIGN AND SERVICES DURING CONSTRUCTION OF ELECTRICAL UPGRADES
RECOMMENDATION
title
Staff recommends that the City Council approve a Professional Services Agreement with N2W Engineering, Inc., in the amount of $274,775, to provide preliminary design of the Leisure Village #1 Lift Station and final design and services during construction of electrical upgrades; and authorize the City Manager, or designee, to execute the agreement upon receipt of all supporting documents.
body
BACKGROUND AND ANALYSIS
The Leisure Village #1 Lift Station, located at the intersection of Cannon Road and Leisure Village Drive, was constructed in 1984 to serve the residential area of Ocean Hills in the southeast region of the city. The station can convey approximately 0.38 million gallons of wastewater per day to the gravity system along Cannon Road that ultimately flows to the San Luis Rey Water Reclamation Facility.
The electrical gear for the lift station has reached the end of its useful life and replacement parts are no longer available due to the age of the equipment. The station has experienced several issues with controls and communications, which necessitate upgrades to ensure continued system reliability and performance. In addition, the existing electrical system does not comply with current standards and codes.
The City issued a Request for Proposals (RFP) on September 10, 2026, seeking qualified engineering consultants to provide preliminary design services, recommend a prioritized list of upgrades needed to extend the service life and reliability of the station, and to complete final design for the urgent electrical upgrades. The RFP also included engineering construction support services during the construction of the electrical upgrades. The deadline for proposal submission was October 13, 2026.
Three qualified consultants submitted proposals. These were reviewed and evaluated by a selection committee based on the criteria outlined in the RFP. Following the evaluation, N2W Engineering, Inc. was determined to be the most qualified consultant based on their experience with similar projects and their comprehensive approach to the scope of work.
Preliminary design is expected to commence in January 2027 and is anticipated to be completed by the end of April 2027. The final design for electrical upgrades is anticipated to begin in May 2027 and is anticipated to be complete by Fall 2027. Construction of electrical upgrades is expected to be take one year.
FISCAL IMPACT
The total amount of the proposed agreement with N2W Engineering, Inc., for preliminary design of the lift station upgrades and final design of the electrical upgrades is $274,775.
The Project will be charged to the Leisure Village Sewer Lift Station No. 1 Rehabilitation account. Funds will be allocated per Table 1 below; there are sufficient funds to proceed with this agreement.
Table 1
|
Leisure Village No. 1 Lift Station Rehabilitation |
|
Description |
Account |
Proposed Agreement Amount |
Available Balance |
|
N2W Engineering Inc. PSA |
Leisure Village Swr Lift Stn #1 909198025722.5305.10400 (Preliminary/Final Design) |
$216,059 |
$223,999 |
|
|
Leisure Village Swr Lift Stn #1 909198025722.5305.10600 (Engineering Services during Construction) |
58,716 |
66,875 |
|
Total Professional Services Agreement (N2W Engineering, Inc.) |
$274,775 |
$290,874 |
Funding for this project comes from sewer flow and service charges in the Sewer Fixed Asset Replacement Fund 722.
COMMISSION OR COMMITTEE REPORT
The Utilities Commission approved Staff’s recommendation at its regularly scheduled meeting on November 17, 2026.
CITY ATTORNEY’S ANALYSIS
The referenced documents have been reviewed by the City Attorney and approved as to form.
Attachments
1. N2W PSA
2. N2W Study and Design Proposal
end
Prepared by: Mabel Uyeda, Water Engineering Manager
Reviewed by: Michael Gossman, Assistant City Manager
Submitted by: Jonathan Borrego, City Manager