Legislation Details

File #: 26-1719    Version: 1
Type: Agreement Status: Consent Agenda
File created: 10/1/2026 In control: City Council
On agenda: 11/4/2026 Final action:
Title: Staff recommends that the City Council approve Amendment 2 to the Professional Services Agreement (PSA) with Ardurra Group, Inc. (Ardurra), in the amount of $208,758, for a total contract amount of $731,596 for additional engineering services and construction phase services (ESDC) of the Buccaneer Force Main; and authorize the City Manager, or designee, to execute the amendment.
Attachments: 1. Staff Report, 2. Amd. 2 to Professional Services Agreement, 3. Exhibit A
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
DATE: November 4, 2026

TO: Honorable Mayor and City Councilmembers

FROM: Water Utilities Department

TITLE: AMENDMENT 2 WITH ARDURRA GROUP, INC. FOR THE BUCCANEER FORCE MAIN FINAL DESIGN

RECOMMENDATION
title
Staff recommends that the City Council approve Amendment 2 to the Professional Services Agreement (PSA) with Ardurra Group, Inc. (Ardurra), in the amount of $208,758, for a total contract amount of $731,596 for additional engineering services and construction phase services (ESDC) of the Buccaneer Force Main; and authorize the City Manager, or designee, to execute the amendment.
body
BACKGROUND AND ANALYSIS

The City of Oceanside (City) presently owns and operates two wastewater treatment facilities: the San Luis Rey Water Reclamation Facility (SLRWRF) and the La Salina Wastewater Treatment Plant (LSWWTP). As the LSWWTP nears the end of its operational life, plans for its decommissioning are underway, with the plant remaining in operation until flows can be redirected to the SLRWRF.

To facilitate the redirection of flows, the new Buccaneer Force Main (BFM) is needed to transport flows. In February 2018, Tetra Tech provided a technical memorandum and 30% design level drawings for the new BFM. The BFM is intended to convey flows from the LSWWTP to the SLRWRF through a force main that is primarily along an alignment in Oceanside Boulevard. It then connects to the Oceanside Mesa Garrison Force Main at Mesa Drive and Garrison Street that will receive flows from two other lift stations before heading north within easement corridors to the SLRWRF.

On August 8, 2018, Council approved a Professional Service Agreement (PSA) with Ardurra (formerly Infrastructure Engineering Corporation or IEC) in the amount of $352,402 to complete the Buccaneer (formerly La Salina) Force Main design. On May 8, 2024, City Council approved an amendment to Ardurra’s PSA, in the amount of $170,436, for a total contract amount of $522,838 to address additional City-directed revisio...